AMT Lachine/SNC Lavalin Construction
New Lachine commuter train maintenance center, 35 tons dual box overhead crane with 20 tons auxiliary hoist and 5 tons double box overhead crane on the same 125′ runway, all equipped with service platform on each side of the crane box with transfer gates and lighting. Monorail 1000′ length with 2 high speed trolleys with 3 tons capacity for the maintenance of cars’ air conditioners.